closecontainer housePTH
 Whatsapp/Webchat/Cell: +86-180 575 25 073
 HOME  |   CONTACTS  |    INQUIRY NOW
Home » Products » Projects Case&Studies » Container House Projects » Mobile Container Hospital Camps in Bahrain

Container House Projects

Mobile Container Hospital Camps in Bahrain

Share to:

Project Name: Mobile Container Hospital Camps in Bahrain
Project Location: Bahrain
Project Duration: 2013
Project Size: Hospital Camps around 2000 SQM
Product Type: Container House/Modular House

Quantity:
  • Container House/Modular House
  • PTH

Mobile Container Hospital Camps in Bahrain


1.Project Overview


Project Name:

Mobile Container Hospital Camps in   Bahrain

Project Features Description:

Mobile Container Hospital Camps in   Bahrain

Project Location:

Bahrain

Project Duration:

2013

Project Size:

Hospital Camps around 2000 SQM

Product Type:

Container House/Modular House


design drawing.jpg


2.Why Choose PTH
1)In 2012, the customer contacted us for the first time and he did not put PTH as their best choice at first. He made the decision when he visited PTH factory and found the size of our factory, the production line, the shop cleanliness and services perfectly meet their requirements.
2)The customer was very comfortable with the quality and service of PTH as he had ordered the container and the activity room before. 
3)Since 2012, the customer has been working with PTH in succession. Products and value of PTH were highly very recognized by him.
  Bahrain.jpg
3.Project Feature & Advantage
1)It’s an eco-home structure, the main structure of steel is Q235 galvanized U-slot, square pipe and a variety of angle aluminum. Roof is the G550 light steel roof truss. Roof panel is the 50mm EPS corrugated sandwich panels; wall panels (inside / outside) using 75mmEPS.
The project has more than 20 different medical field functional areas。

drawing.jpg
4.Logistics and Transportation
3)There were a total of eight 40-foot high cabinet transport; packaging and loading pictures are as follows:

The Hospital in Bahrain (2)

The Hospital in Bahrain (3)

The Hospital in Bahrain (4)


5.Installation
The customer asked PTH to send senior engineers to help install, the whole process lasted 48 days. Prior to shipment, PTH also gave the customer a list of tools needed to install, leaving a very professional impression to the customer.

hospital.jpg




What We Do

Our Divisions

Project & Case Studies

Send us a Message

Copyright  © 2008-2018 Zhejiang Putian Integrated Housing Co., Ltd. All rights reserved.  Sitemap Prefabricated Building Manufacturer  
Powered by Hi-eweb.com